Wantagh School Bond Projects

What We’re Building — And Why It Matters

This bond is about much more than construction.

It is about creating more opportunities for our students, giving successful programs the space they deserve, taking care of the schools and facilities our community already owns, and preparing the district for the next generation of Wantagh families.

Want to Learn More?

For complete details about the proposed bond, including project information, costs, tax impact, timelines, and voting information, visit the Wantagh Union Free School District’s official Bond 2026 webpage.

Project Cost and Timeline

Click on a project to learn more about it.

Project Amount Estimated Completion Date
$2,080,000
September 2027
$5,310,000
January 2028
$8,145,000
September 2028
$5,770,000
September 2028
$20,325,500
March 2028
$14,407,500
March 2028
$5,192,000
April 2029
$1,700,000
September 2027
$950,000
Ongoing
$1,545,000
Ongoing
$1,100,000
N/A
$500,000
Ongoing
$2,475,000
June 2028
$350,000
September 2027
Total
$69,850,000

Elementary School Playground Improvements

Investment: $2,080,000

Wantagh Elementary • Forest Lake Elementary • Mandalay Elementary

Why It Matters

Recess should be a time when every child has the space and opportunity to play, be active and enjoy time with their friends.

This project will modernize and significantly expand playground areas across all three Wantagh elementary schools, creating more usable space, improving the surfaces children play on every day, and providing durable equipment designed to serve Wantagh families for years to come.

A major improvement will be moving away from the wood-chip play surfaces used in existing areas. Wood chips can be messy, get tracked into schools and homes, and require raised plastic borders to keep them contained.

The new turf safety surfaces will provide a cleaner, softer and more comfortable play area without loose wood chips or the plastic containment borders surrounding them.

Just as importantly, the project creates substantially more playground space, allowing more children to use the equipment at the same time instead of access being limited simply because there isn’t enough room.

What This Means for Our Kids

  • More room to play
  • More children able to use playground equipment at the same time
  • No more messy wood-chip surfaces in renovated playground areas
  • Softer, cleaner and more comfortable turf safety surfacing
  • Removal of raised plastic wood-chip borders
  • New and expanded age-appropriate equipment
  • Durable improvements built to serve Wantagh children for years to come
  • A better recess experience with more opportunities for activity, movement and
    socialization

What's Included - Improvements at Each School

Wantagh Elementary
The existing playgrounds will be removed and replaced with two large new playground areas behind the school, featuring new age-appropriate equipment and turf safety surfacing.

Forest Lake Elementary
Existing playground areas will be replaced with new playground equipment and a new swing area, providing students with an updated and expanded outdoor play environment.

Mandalay Elementary
Mandalay’s existing playground equipment and swings will remain, but the wood chips underneath them will be completely removed and replaced with turf safety surfacing.

In addition, a new playground will be added, significantly increasing Mandalay’s overall playground capacity and allowing more students to use playground equipment during recess.

Performing Arts & Music

Investment: $5,310,000

District Auditorium Renovation at Wantagh High School

Why It Matters

Our students and educators have built award-winning music and theater programs, with students dedicating countless hours to band, chorus, orchestra and theatrical productions.

The facilities they perform and learn in should reflect the quality of those programs.

The Wantagh High School auditorium is also much more than a high school theater. It is the primary performance and gathering space for the entire Wantagh School District, serving children from their elementary school years through high school graduation.

This is where students step onto a stage for their first elementary concert, perform in musicals and plays, receive awards, participate in moving-up ceremonies and celebrate some of the biggest moments of their school years.

A complete renovation will provide modern sound, lighting, projection and stage capabilities that allow our students to perform, create and learn with the tools today’s performing arts programs deserve.

Better facilities also create greater flexibility for rehearsals, productions, performances and additional programming as student interests continue to grow.

What This Means for Our Students & Community

  • A performance space that better reflects the quality of Wantagh’s successful performing arts programs
  • Modern sound, lighting and production technology
  • A better experience for student performers and audiences
  • Improved facilities for concerts, musicals and plays
  • Better backstage space for set construction and production work
  • Greater flexibility for rehearsals and performances
  • More capacity to expand performing arts opportunities and programming
  • A modern gathering place for the entire Wantagh community

What's Included:

  • New flooring and floor lighting
  • New auditorium seating
  • Replacement of wall panels
  • Stage refinishing
  • New stage curtains
  • Upgraded theatrical lighting
  • Upgraded sound system and sound booth
  • New projector and screen
  • Replacement doors
  • Renovated backstage/set-building area

Wantagh High School Band and Chorus Rooms

Investment: $8,145,000

Why It Matters

Wantagh’s band, chorus, orchestra and theater programs have given our community award-winning performances and accomplishments to celebrate. Yet the facilities available to those students have not kept pace with the success of the programs.

Wantagh High School currently does not have its own dedicated chorus room, requiring high school chorus students to use the middle school chorus room.

The existing high school band room is undersized, and its location creates conflicts because rehearsals can be heard inside the auditorium when both spaces are being used.

Our students have succeeded despite those limitations.

Imagine what these programs can do when we give them the space they deserve.

The project will create a new 2,100-square-foot band room and 1,250-square-foot chorus room, providing dedicated spaces designed specifically for music instruction and rehearsal.

Dedicated band and chorus rooms give the district greater flexibility for additional classes, ensembles, rehearsals, lessons and future programs without constantly competing for the same limited spaces.

The project also creates dedicated storage for instruments and equipment that currently occupy auditorium and stage space.

Moving that equipment frees up additional space and allows the existing band-room area to be repurposed for theater set construction and design.

This one addition creates benefits that extend across band, chorus, orchestra, theater and the auditorium itself.

What This Means for Our Students

  • A dedicated high school chorus room where none currently exists
  • A significantly larger, dedicated band room
  • Facilities that better match the quality of Wantagh’s successful music programs
  • More room for students to participate
  • Greater flexibility to add classes, ensembles and new programming
  • More rehearsal availability
  • Dedicated instrument and equipment storage
  • Less conflict between music rehearsals and auditorium activities
  • Auditorium and stage space freed from instrument storage
  • Dedicated theater set-building and design space
  • More opportunities for students interested in both performance and behind-the-scenes production

What's Included

  • The creation of a 1,250 square foot chorus room and a 2,100 square foot band room
  • Adequate storage for all instruments that will free up space on the current auditorium stage
  • Allows for the creation of a space for set building and design for theater productions

Districtwide UPK Expansion - Six New Classrooms

Investment: $5,770,000

Why It Matters

For Wantagh families with young children, UPK shouldn’t begin with uncertainty.

Today, limited classroom space means families have to enter a lottery for UPK, wait to find out whether their child receives a spot, and then, if accepted, find out which elementary school their child will attend. The addition of six new UPK classrooms creates the space needed to change that.

With the additional capacity, every eligible Wantagh child can be guaranteed a UPK seat at the elementary school they are zoned to attend — Wantagh Elementary, Forest Lake or Mandalay.

The additional classrooms also give the district something it does not have today: Room to grow the program.

Wantagh’s current UPK schedule has shorter hours than the district’s other elementary grades. Creating sufficient dedicated classroom space lays the groundwork for the district to consider a future UPK program with hours more closely aligned with the rest of the elementary school day.

The bond does not itself establish those expanded hours, but it provides the physical classroom capacity needed to make that type of future expansion possible.

What This Means for Wantagh Families

  • Eliminates the need for (and the uncertainty that comes from) a UPK lottery
  • Guarantees eligible children a UPK seat
  • Children can attend UPK at their zoned elementary school
  • Parents know where their child will attend instead of waiting for placement
  • Children begin building relationships in the school community they will continue into kindergarten
  • Creates dedicated capacity for UPK without taking space away from other grades and programs
  • Provides room for the district’s UPK program to continue growing
  • Paves the way for the possibility of expanded UPK hours in the future

Districtwide Athletic Field Improvements

Wantagh High School Investment: $20,325,500 • Forest Lake Investment: $14,407,500

Why It Matters

More Fields. More Opportunities. More Wantagh Students Able to Play.

Wantagh’s athletic programs serve students across multiple grade levels and many different teams, but all of those teams ultimately face the same challenge:

There are only so many fields available at the same time.

During the busiest sports seasons, middle school, JV, varsity, and community (e.g. PAL) teams all need places to practice and compete after school.

Add weather, limited daylight and overlapping seasons, and available field space becomes even more difficult to manage.

The bond takes a districtwide approach to solving that problem, creating additional athletic capacity at both Wantagh High School and Forest Lake.

The goal isn’t simply to build better fields. It’s to create enough quality space for more Wantagh students to participate. We’re investing in the ability for more students — at more ages and in more programs — to get on a field and be part of a team.

School athletics give students opportunities to be active, represent their school, become part of a team, build friendships, learn discipline and find something they enjoy being part of.

Forest Lake Is More Than an Elementary School Field

One of the most important things to understand about the Forest Lake project is who actually uses these fields.

Forest Lake occupies a unique location within the district’s secondary-school campus and is connected to the high school area by a pedestrian footbridge.

Because Wantagh Middle School does not have its own dedicated complex of athletic fields, the Forest Lake fields effectively serve as home fields for many of our middle school athletic programs, in addition to supporting JV teams and other district uses.

So while the fields may physically be located at Forest Lake, this is not simply an athletic investment in one elementary school.

Forest Lake is home for our middle school and JV athletes, those students deserve quality fields too. The bond is designed to alleviate some of the disruption to the homes nearby with the creation of additional parking areas and spaces.

What's Coming to Forest Lake

  • New multipurpose turf field for soccer, lacrosse, football and flag football
  • Second multipurpose turf field for soccer, lacrosse and baseball
  • Bleachers and scoreboards
  • Two new parking areas
  • More than 50 additional parking spaces
  • Turf outfield at the existing softball/Little League field

What's Coming to Wantagh High School

  • Wantagh baseball and softball will each receive a complete varsity facility designed around their sport, including:
    • Full synthetic-turf playing surfaces
    • Home and away bleachers
    • Scoreboards
    • Batting cages
    • Bullpens
    • Permanent outfield fencing
    • Press boxes
    • Equipment storage
    • Field lighting
    • Safety fencing and protective netting
  • New full-size multipurpose field for soccer, lacrosse and flag football
  • Field lighting
  • New away bleachers for the existing main turf field
  • Approximately 25 additional parking spaces
  • Connecting walkways
  • Renovated athletic-complex entrance
  • Resurfaced tennis courts
  • Relocation of the existing maintenance area

Multipurpose Athletic Barn

Investment: $5,192,000

Why It Matters

The Multipurpose Athletic Barn is one of the most versatile projects in the bond.

While the approximately 7,000-square-foot facility will provide indoor practice space, its real value is everything else it allows the district to do.

It will serve as a central support facility for the entire Wantagh High School athletic complex, providing bathrooms, locker rooms, an athletic trainer’s area, concessions and flexible indoor space — all immediately adjacent to the fields.

At the same time, it creates something many Wantagh programs have never really had: A flexible, year-round space to call their own. 

Not every school activity fits neatly onto a field, into a gym or inside a traditional classroom. Programs such as cheerleading, kickline, marching band, or even PE need significant open space to practice.

Yet these programs can often find themselves trying to make do with cafeterias, classrooms and whatever other space happens to be available. Those spaces weren’t designed for what these students are trying to do. The Multipurpose Athletic Barn changes that.

Its large, flexible indoor area provides a year-round practice option for programs that need open space but don’t necessarily need a traditional gymnasium.

Because the space is multipurpose, its use can change throughout the day and throughout the year.

The goal isn’t to build a facility for one team. It’s to create space that many different groups of students can use.

During the school day, it can support physical education.

After school, it can provide space for cheerleading, kickline, marching band, athletic teams and other student programs.

During bad weather and the winter months, it becomes year-round indoor practice space.

During outdoor games and events, it provides bathrooms, locker rooms, concessions and athletic training facilities.

And by keeping many of these functions outside the main high school building, it can help improve security, building access and maintenance during evening and weekend events.

What's Included

  • Approximately 7,000 square feet of flexible indoor space
  • Multipurpose practice area
  • Space for cheerleading, kickline, marching band and other programs
  • Middle and high school physical education use
  • Indoor athletic practice space
  • Batting cages
  • Locker rooms, meaning teams participating in outdoor events do not need to continually enter and exit the main high school building — reducing dirt, wear and tear, and unnecessary foot traffic inside the school
  • Bathrooms directly adjacent to the athletic fields, giving athletes and spectators convenient facilities without requiring everyone to enter the main school building
  • Athletic trainer’s room adjacent to the fields
  • Permanent concession area with exterior service window

Protecting and Improving The Schools We Already Have

A Bond Isn’t Just About Building Something New​

Some of the most exciting parts of the bond are easy to see — new playgrounds, fields, classrooms and performing arts spaces.

But responsible long-term planning also means taking care of the schools and infrastructure our community already owns.

Every school building has systems that eventually need to be repaired or replaced.

Plumbing ages. Windows deteriorate. Pavement and sidewalks wear down.

Bathrooms need renovation. Security needs change. Fields need proper maintenance.

Ignoring those needs doesn’t make them disappear.

This portion of the bond invests in the basic infrastructure our students, teachers and community depend on every day, while helping preserve the facilities Wantagh taxpayers have already invested in.

Mandalay and Forest Lake Elementary School Bathrooms

Investment: $1,700,000

Why It Matters

Bathrooms may not be the most exciting part of a school bond, but they are among the most frequently used spaces in any school.

At Mandalay, the district has already begun renovating classroom bathrooms, with six already completed.

The bond allows that work to continue and completes the remaining bathrooms.

At Forest Lake, two faculty bathrooms will also be addressed.

The goal is simple:

Finish the work, modernize aging facilities and improve spaces students and staff use every single day.

What's Included

  • Completion of 10 classroom bathrooms at Mandalay
  • Completion of two faculty bathrooms at Forest Lake

Forest Lake Underground Plumbing Replacement

Investment: $950,000

Why It Matters

The pipes underneath a school are every bit as important as the classrooms above them.

The bond will replace existing plumbing beneath Forest Lake Elementary, addressing an important piece of the buildings underlying infrastructure.

Replacing aging infrastructure in a planned manner is preferable to waiting for major problems that can disrupt a school and require emergency repairs.

Districtwide Asphalt, Sidewalk, and Curb Replacement

Investment: $1,545,000

Why It Matters

Every school day, students, parents, teachers, buses and vehicles move throughout our school properties.

Parking lots, roadways, sidewalks and curbs take years of constant use and exposure to Long Island weather. Eventually, they need to be replaced. This project addresses deteriorating paved and pedestrian areas throughout the district, helping keep our campuses safe, accessible and properly maintained.

These may not be glamorous improvements, but they are part of responsible ownership of our school facilities.

What's Included

  • Replacement of aging asphalt
  • Sidewalk replacement
  • Curb replacement
  • Improvements across district properties

Elementary School Window Replacement

Investment: $1,100,000

Why It Matters

Windows are a major part of every school building and, like every other building component, eventually reach the point where replacement becomes necessary.

The bond continues the district’s ongoing elementary window replacement program rather than allowing aging windows to continue deteriorating.

Replacing windows systematically allows the district to continue modernizing its elementary
buildings while protecting the community’s investment in those facilities.

What's Included

  • Replaces aging building components

Districtwide Security Improvements

Investment: $500,000

Why It Matters

As our facilities grow, our security infrastructure needs to grow with them.

The bond creates and renovates spaces throughout the district, and security needs to be incorporated into those improvements from the beginning.

New security cameras and lighting will expand coverage to new and improved areas included in the bond.

What's Included

  • Security cameras for new facilities and areas
  • New and upgraded security lighting

New District Maintenance Facility

Investment: $2,475,000

Why It Matters

The maintenance department doesn’t serve one school: It helps maintain every school building, field, playground, parking lot, sidewalk and district property in Wantagh.

The new maintenance facility will dramatically increase the district’s indoor space for maintenance vehicles, machinery, tools and equipment, giving the maintenance department a facility that better supports the work it performs across the entire district.

Plows, snow blowers, landscaping equipment, tractors, machinery and other equipment last longer when they can be properly stored and maintained indoors rather than continually exposed to rain, snow, ice, sun and changing temperatures.

The new facility will significantly expand indoor storage, helping protect that equipment from the elements to extend its useful life and get more value out of what the district already owns.

When equipment is stored outside during a storm, maintenance crews may first have to clear snow and ice from the equipment itself and the areas around it before they can begin clearing the district.

With plows, snow blowers and other equipment stored indoors, crews can be better positioned to get equipment out and working to clear parking lots, roadways, sidewalks and school entrances cleared so our schools can safely reopen.

More indoor space also means maintenance work doesn’t have to stop simply because the weather doesn’t cooperate.

The facility will give district personnel additional protected space to service equipment, make repairs, and perform maintenance work throughout the year.

The bond proposes significant investments in playgrounds, athletic fields, buildings and grounds. Those investments will need to be maintained long after construction is complete. Better facilities are only as good as our ability to take care of them.

The new maintenance facility gives the district’s maintenance team the space and infrastructure necessary to protect those investments and keep Wantagh’s schools and grounds looking and functioning the way our community expects.

A Better Location for Maintenance Operations
The new location also provides an important benefit to the surrounding community.

Moving the maintenance facility away from nearby residential homes creates greater separation between residents and the everyday activities associated with a working maintenance operation.

Maintenance work sometimes needs to begin very early in the morning, particularly during snowstorms and weather events when schools need to be prepared before students and staff arrive.

Vehicles, plows, machinery and other equipment naturally create noise when they are started and moved.

Relocating the facility farther from residential properties provides a more appropriate location for those operations and gives crews greater flexibility to begin necessary work when it needs to be done.

What's Included

  • Remove existing building from the entrance to the athletic area at WHS
  • Construct new building in the north parking lot of Wantagh Middle School

Mandalay Natural-Grass Fields

Investment: $350,000

Irrigation & Field Restoration

Why It Matters

Mandalay’s north and south fields will remain natural grass, making proper irrigation and maintenance especially important.

A permanent irrigation system gives the district the ability to properly maintain these fields instead of depending primarily on rainfall and temporary watering solutions.

The project also includes hydro-seeding throughout the north and south fields to help establish healthier, more consistent grass coverage.

Well-maintained grass fields provide valuable outdoor space for PE classes, recess, outdoor school activities, youth programs, and community recreation.

Investing in irrigation isn’t simply about making the grass look better.

It’s about protecting and maintaining fields that students and the community use over and over again.

What's Included

  • Permanent irrigation system
  • Hydro-seeding throughout the north field
  • Hydro-seeding throughout the south field
  • Restoration and improvement of natural-grass playing surfaces

Taking Care of What We Own

Why It Matters

A school bond shouldn’t only be judged by the new things it builds.
It should also answer a basic question:
Are we taking care of what our community has already paid for?
This bond does both.

It invests in exciting new opportunities for students while also putting resources into the less-visible infrastructure that keeps our schools functioning: Bathrooms. Plumbing. Windows. Roads. Sidewalks. Curbs. Security. Maintenance. Fields.

These aren’t extras.

They are part of operating and maintaining a school district responsibly.

A new playground may be what families notice first.
A new field may be what people see when they drive by.
But underneath it all, our schools still need working plumbing, maintained buildings, safe walkways, functioning bathrooms, secure facilities and the infrastructure necessary to keep everything running.

The bond isn’t only about what Wantagh can build next. It’s also about taking care of what generations of Wantagh residents have already built.

An independent community organization advocating for the passage of the Wantagh school bond.

FOLLOW US

© 2026 Yes for Wantagh. Paid for by Yes for Wantagh. Not Affiliated with or funded by the Wantagh Union Free School District.